At ENGINIQ, we bridge the gap between technical complexity and regulatory sign-off. We prepare your site for success through the following specialized services:
Full Statutory Compliance Management
Comprehensive PECPR gap analysis of existing assets to identify non-conformities before the CIB arrives.
Direct liaison with CIB inspectors to ensure all technical requirements are met for final sign-off.
Creation of prioritized action plans to close out gaps and ensure site-wide compliance.
Coordination of specialized NDT services (RT, UT, MT, PT) to verify equipment integrity.
Technical Documentation & Data Recovery
Reconstructing lost or incomplete data packs for aging assets to meet modern compliance standards.
Full compilation of professional Data Books, including WPS, PQR, and NDT records.
Generation of As-Built P&IDs and Piping Isometrics to reflect actual field conditions.
Independent technical review of contractor quality packs against ASME and EN codes.
Engineering Support & Gap Closure
WPS/PQR Management: Expert development of welding documentation to ASME IX or EN ISO 15614.
Asset Register Cleanup: Aligning CMMS (Maximo/SAP) data with physical asset tags and compliance status.
NDT Management: Developing test procedures and witnessing hydrostatic or pneumatic testing.
Technical Memorandums: Providing code-compliant justifications for material substitutions or repairs.